← All SOR lists

Gujarat PWD 2024-25 (default)

Bundled with the app for testing.

1308 items · used by 1 job
Manage Mappings →
SOR CodeRateUnitDescription
02001A1829.8CUMLime Mortar 1:1 (1-lime putty/ Equivalent dry Hydrated Lime : 1-Fine sand)
02002A1655.39CUMLime Mortar 1:2 (1-lime putty/ Equivalent dry Hydrated Lime : 2-Fine sand)
02003A1568.43CUMLime Mortar 1:3 (1-lime putty/Equivalent dry Hydrated Lime : 3 - Fine sand)
02004A1761CUMLime Mortar 1:1.5 (1-lime putty/ Equivalent dry Hydrated Lime : 1.5 Fine sand)
02005A6161.72CUMCement Mortar 1:1 (1-Cement: 1- fine sand)
02006A4430.61CUMCement Mortar 1:2(1-Cement: 2-fine sand)
02007A3565.45CUMCement Mortar 1:3(1-Cement: 3- fine sand )
02008A2875.11CUMCement Mortar 1:4(1-Cement: 4- fine sand )
02009A2503.39CUMCement Mortar 1:5(1-Cement: 5- fine sand )
02010A2184.77CUMCement Mortar 1:6(1-Cement: 6- fine sand )
02011A3592.7CUMCement Mortar 1:3 (1-Cement: 3 - coarse sand)
02012A2902.36CUMCement Mortar 1:4 (1-Cement: 4 - coarse sand)
02013A2530.64CUMCement Mortar 1:5 (1-Cement: 5 - coarse sand)
02014A2212.02CUMCement Mortar 1:6 (1-Cement: 6 - coarse sand)
02015A1893.4CUMCement Mortar 1:8 (1-Cement: 8 - fine sand)
02016A1783.66CUMLime Mortat 1:1.5 (1- Lime putty / Equivalent dry hydrated Lime:1.5 coarse sand)
04001A121.77CUMExcavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil
04001B155.52CUMExcavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(B) Dense or Hard soil
04001C265.55CUMExcavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard Murrum
04001D274.35CUMExcavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(D) Soft rock not requiring Blasting
04001E619.12CUMExcavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(E) Hard Rock
04002A134.98CUMExcavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil
04002B168.71CUMExcavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(B) Dense or Hard soil
04002C284.62CUMExcavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(C) Hard Murrum
04002D297.82CUMExcavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead. (D) Soft rock not requiring Blasting
04002E642.6CUMExcavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(E) Hard Rock
04003A148.18CUMExcavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil
04003B181.93CUMExcavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(B) Dense or Hard soil
04003C297.82CUMExcavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing of the excavated stuff upto 50 Meter lead.(C) Hard Murrum
04003D321.3CUMExcavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(D) Soft rock not requiring Blasting
04003E666.07CUMExcavation for foundation for depth from 3.0 m to 5.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(E) Hard Rock
04004A21.96CUMExtra for additional depth more than 5.0 m for excavation for foundation including sorting out and stacking of useful materials and disposing of the excavated stuff upto 50 m lead.(A) Loose or soft soil
04004B21.96CUMExtra for additional depth more than 5.0 m for excavation for foundation including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 m lead.(B) Dense or Hard soil
04004C30.19CUMExtra for additional depth more than 5.0 m for excavation for foundation including sorting out and stacking of useful materials and disposing of the excavated stuff upto 50 m lead.(C) Hard Murrum
04004D38.97CUMExtra for additional depth more than 5.0 m for excavation for foundation including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 m lead.(D) Soft rock not require Blasting
04004E38.97CUMExtra for additional depth more than 5.0 m for excavation for foundation including sorting out and stacking of useful materials and disposing of the excavated stuff upto 50 m lead.(E) Hard Rock
04005A17.28CUMAdd extra for Disposing off the excavated stuff of above items for lead of (A) 50 m to 100 m
04005B34.56CUMAdd extra for Disposing off the excavated stuff of above items for lead of (B) 100 m to 200 m
04005C51.84CUMAdd extra for Disposing off the excavated stuff of above items for lead of (C) 200 m to 300 m
04005D76.8CUMAdd extra for Disposing off the excavated stuff of above items for lead of (D) 300 m to 400 m
04005E128CUMAdd extra for Disposing off the excavated stuff of above items for lead of (E) 400 to 500 m
04007A477.03CUMFilling in plinth with sand under floors including watering ramming, consolidating and dressing complete
04008A291.47CUMFilling in foundation and plinth with murrum or selected soil in layers of 20cm. thickness including watering, ramming and consolidating etc. complete.
04009A615.31CUMFilling in foundation and plinth with brick Bats Chhara in layers of 20cm. thickness including watering, remming and consolidating etc. complete.
04010A1102.74NOSBoring holes 3.5 m deep in ordinary soil (for cast in situ piles) and getting out the soil and disposal of the surplus excavated soil as directed within a lead of 50 Meter for following diameter of pipes.(i)200 mm
04010B1321.1NOSBoring holes 3.5 m deep in ordinary soil (for cast in situ piles) and getting out the soil and disposal of the surplus excavated soil as directed within a lead of 50 Meter for following diameter of pipes.(ii) 250 mm
04010C1544.22NOSBoring holes 3.5 m deep in ordinary soil (for cast in situ piles) and getting out the soil and disposal of the surplus excavated soil as directed within a lead of 50 Meter for following diameter of pipes.(iii) 300 mm
04011A440.15NOSExtra for under reaming inside the bore Holes for under reamed piles of following Diameter.(i) 200 mm
04011B528.18NOSExtra for under reaming inside the bore Holes for under reamed piles of following Diameter.(ii) 250 mm
04011C657.28NOSExtra for under reaming inside the bore Holes for under reamed piles of following Diameter.(iii) 300 mm
Showing first 50 of 1308 items.